Get In Touch

Get In Touch

This field is for validation purposes and should be left unchanged.
Contact Page

Lift Installation Kier Construction

Cambridgeshire, United Kingdom

Lift Installation for Kier Construction @ Histon & Impington primary school. This unique lift shaft is a level of detail that befits our lift installations, the wooden wall cladding looks amazing, just a shame only a select few people will ever see the inner workings of these lifts. Ecocell® was the lift chosen to be installed for its unique features that include a battery backup system in case of a power outage. The Ecocell® lift is only available from Morris Vermaport.

The Ecocell® is designed to reduce energy consumption and to provide an “integrated standby power supply” for evacuation and power loss situations. An Ecocell® can be fitted as a new lift, or a replacement lift, Click here to find out more