Lift Installation Peterborough: MV Lifts is proud to have completed the installation of a 3-floor, 1000kg (13-person) traction lift at Friary Court, a 40-apartment assisted living facility operated by the Longhurst Group.
This modern lift has been carefully selected and installed by our experienced in-house team to provide reliable, long-term service in this high-traffic environment. Designed with durability and user comfort in mind, it meets the specific demands of assisted living facilities, where consistent performance and ease of use are essential.
Friary Court is a vibrant, busy residence that supports its community with tailored care and independence, and the lift’s installation is a vital part of ensuring accessibility throughout the building. With safety, efficiency, and long-term reliability at the forefront of the design, this state-of-the-art lift will support residents and staff alike for many years to come.
Another expertly delivered project by MV Lifts, combining high standards of engineering with a deep understanding of our client’s needs.